The Field Journal

Labor & Process Design

Removing work the packaging and production system should never have required.

Articles

10 articles
Sep 08

A Walkthrough Is Not a Labor Baseline

Observed staffing, coverage requirements, and paid hours answer different questions. A labor case needs to reconcile them before assigning value.

Aug 27

Build the Run Record Before Asking for the Rate

A plant may have output, payroll and start times in different systems without being able to calculate a defensible rate. The problem can be the relationship between the records.

Aug 25

Recovered Hours Need a Conversion Plan

A time saving is an operating opportunity. Its financial value depends on what happens to the recovered hours and which costs actually change.

Aug 24

The Average Is Not the Operating Condition

An average can summarize performance while hiding the conditions that drive a staffing or process decision. Segment the baseline where the work changes.

Aug 18

Count the Work the Box Assigns

A box design assigns work before the first operator touches it. Inserts must be positioned, tape applied and components oriented. Those steps belong in the sourcing comparison.

May 21

Price the Hours the Project Actually Changes

Which paid hours and support costs would disappear or change if a labor or automation proposal worked?

May 13

Stress-Test the Coverage Behind a Labor Plan

Can a proposed crew configuration cover critical work during breaks, absences, and difficult product runs?

May 06

The Equipment Footprint Is Not the Operating Footprint

Does a proposed layout leave enough room and access to operate the surrounding process?

Mar 26

Transfer the Operating State at Shift Handoff

What must the incoming crew know to continue the current run and make the next decision?

Mar 06

Price the Next Overtime Window

What incremental value would the next overtime window produce after its full operating demands?