Count the Work the Box Assigns
A box design assigns work before the first operator touches it. Inserts must be positioned, tape applied and components oriented. Those steps belong in the sourcing comparison.
A box design assigns work before the first operator touches it. Inserts must be positioned, tape applied and components oriented. Those steps belong in the sourcing comparison.
Counting them is the start of the analysis, not a rule that every additional touch is waste.
Observe the actual packing sequence
Record the tasks for representative products and normal operating conditions. Include material replenishment, adjustment, error correction and shared support, not just the fastest complete pack.
Distinguish necessary protection and handling from work that an alternative design might eliminate. Technical owners must resolve any drawing or sample discrepancy before the team treats it as the approved baseline.
Touch count helps locate work. Measured time and operating evidence determine its significance.
Compare the complete alternatives
A taped insert and a locking insert can differ in material cost, assembly time, storage space, tooling and supplier compatibility. Neither is inherently the better design.
In a hypothetical comparison, an alternative costs $0.06 more per pack and removes 15 seconds of handling. At 40,000 packs, it adds $2,400 in material and recovers about 167 hours.
Those hours are not automatically a wage saving. Determine whether they reduce overtime, avoid added staffing or become usable capacity for other work. If no cost changes, report recovered time separately.
Include tooling and transition
Add one-time tooling, trial work, existing stock and any supplier-change expense. Spread tooling over credible usable volume, not an optimistic forecast that the business has not adopted.
Check whether the selected supplier process suits the dimensions, material, print and order pattern. A technically feasible drawing can be expensive in one process and attractive in another.
Release the work instruction too
An approved design needs an approved packing method and a way to identify the right revision. Validate the relevant protection and handling requirements in that configuration.
The economic winner is the design whose purchase, operating and transition costs support the required outcome. Sometimes that is the cheaper box. Sometimes it is the box that gives the crew less work.